This open air center was
constructed in two phases
and anchored with the
construction of a Kroger
store. Phase I begin in
2000 with Phase II completed
in 2003. The total envelope
of building construction
consisted of load bearing
masonry with a steel frame
support of the roofing
systems. The building’s
exterior walls are a combination
of brick, décor
masonry block, aluminum
frame and glass store
fronts and EIFS veneer.
General
Contracting
Construction Management
Design-Build
Facilities Maintenance |